Service description

Access roads

We have experience to carry out dirt movements projects for mine access roads with very complicated topography such as the one for M3 Mexicana, with a 10 km by 25 m wide road called Run of Mine developed at the top of the mountain, where it was required to take the equipment to the top of very steep slopes to manually to give floor to prepare the drilling platforms.